|
Item List 251033 |
Date:02/06/2026 |
|
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
| Contract ID | 251033 | Primary Project Number | DE04702512533 |
| Contract Description | KY-251 | ||
| Primary County | HARDIN | Fed/St Number | 047GR25D033-FD06 |
| Vendor ID | 03943 | Vendor Name | DIRT WORKS UNLIMITED LLC |
| Bid Amount | $ 11,045,270.68 | ||
| SM- Project | DE04702512533 |
| Fed/State Number | FD06 047 0251 002-007 |
| Project Description | KY-251 |
| *********** |
| SM- Project | DE04702512533 | CATEGORY NUMBER | 0001 | CATEGORY Description | PAVING |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0005 | CRUSHED STONE BASE | 00003 | 37,708.000 |
37,708.000 |
$31.860 |
TON | 10.9 |
| 0010 | TRAFFIC BOUND BASE | 00020 | 490.000 |
490.000 |
$39.310 |
TON | 0.2 |
| 0015 | ASPHALT SEAL AGGREGATE | 00100 | 325.000 |
325.000 |
$105.730 |
TON | 0.3 |
| 0020 | ASPHALT SEAL COAT | 00103 | 39.000 |
39.000 |
$906.280 |
TON | 0.3 |
| 0025 | LEVELING & WEDGING PG64-22 | 00190 | 4,000.000 |
4,000.000 |
$92.490 |
TON | 3.3 |
| 0030 | CL2 ASPH BASE 1.00D PG64-22 | 00212 | 21,547.000 |
21,547.000 |
$80.360 |
TON | 15.7 |
| 0035 | CL2 ASPH SURF 0.38D PG64-22 | 00301 | 2,168.000 |
2,168.000 |
$93.850 |
TON | 1.8 |
| 0040 | CL2 ASPH SURF 0.38B PG64-22 | 00307 | 3,970.000 |
3,970.000 |
$86.550 |
TON | 3.1 |
| 0045 | CONCRETE-CLASS A | 08100 | 498.440 |
498.440 |
$504.040 |
CUYD | 2.3 |
| 0050 | JOINT ADHESIVE | 20071EC | 50,400.000 |
50,400.000 |
$0.490 |
LF | 0.2 |
| 0055 | ASPHALT MATERIAL FOR TACK NON-TRACKING | 24970EC | 39.000 |
39.000 |
$651.370 |
TON | 0.2 |
Category Total $4,240,226.29 |
| SM- Project | DE04702512533 | CATEGORY NUMBER | 0002 | CATEGORY Description | ROADWAY |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0060 | CRUSHED AGGREGATE SIZE NO 2 | 00078 | 32,385.000 |
32,385.000 |
$28.280 |
TON | 8.3 |
| 0065 | PERFORATED PIPE-4 IN | 01000 | 8,280.000 |
8,280.000 |
$14.920 |
LF | 1.1 |
| 0070 | NON-PERFORATED PIPE-4 IN | 01010 | 902.000 |
902.000 |
$14.020 |
LF | 0.1 |
| 0075 | PERF PIPE HEADWALL TY 1-4 IN | 01020 | 11.000 |
11.000 |
$639.050 |
EACH | 0.1 |
| 0080 | PERF PIPE HEADWALL TY 3-4 IN | 01028 | 36.000 |
36.000 |
$927.700 |
EACH | 0.3 |
| 0085 | DELINEATOR FOR GUARDRAIL BI DIRECTIONAL WHITE | 01987 | 31.000 |
31.000 |
$16.460 |
EACH | 0.0 |
| 0090 | BARRICADE-TYPE III | 02014 | 17.000 |
17.000 |
$151.050 |
EACH | 0.0 |
| 0095 | REMOVE PAVEMENT | 02091 | 4,301.000 |
4,301.000 |
$4.990 |
SQYD | 0.2 |
| 0100 | TEMP DITCH | 02159 | 8,575.000 |
8,575.000 |
$1.070 |
LF | 0.1 |
| 0105 | CLEAN TEMP DITCH | 02160 | 4,288.000 |
4,288.000 |
$0.880 |
LF | 0.0 |
| 0110 | ROADWAY EXCAVATION | 02200 | 131,420.000 |
131,420.000 |
$8.580 |
CUYD | 10.2 |
| 0115 | WATER | 02242 | 650.000 |
650.000 |
$0.010 |
MGAL | 0.0 |
| 0120 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 5.000 |
5.000 |
$82.690 |
EACH | 0.0 |
| 0125 | REMOVE GUARDRAIL | 02381 | 4,272.000 |
4,272.000 |
$3.850 |
LF | 0.1 |
| 0130 | GUARDRAIL END TREATMENT TYPE 4A | 02391 | 6.000 |
6.000 |
$3,909.700 |
EACH | 0.2 |
| 0135 | TEMP GUARDRAIL | 02397 | 462.500 |
462.500 |
$23.050 |
LF | 0.1 |
| 0140 | RIGHT-OF-WAY MONUMENT TYPE 1 | 02429 | 129.000 |
129.000 |
$192.600 |
EACH | 0.2 |
| 0145 | WITNESS POST | 02432 | 3.000 |
3.000 |
$162.590 |
EACH | 0.0 |
| 0150 | CHANNEL LINING CLASS II | 02483 | 217.000 |
217.000 |
$66.050 |
TON | 0.1 |
| 0155 | CHANNEL LINING CLASS III | 02484 | 351.000 |
351.000 |
$50.490 |
TON | 0.2 |
| 0160 | CLEARING AND GRUBBING 45.4 ACRES | 02545 | 1.000 |
1.000 |
$124,417.580 |
LS | 1.1 |
| 0165 | TEMPORARY SIGNS | 02562 | 665.500 |
665.500 |
$6.040 |
SQFT | 0.0 |
| 0170 | EDGE KEY | 02585 | 245.000 |
245.000 |
$5.700 |
LF | 0.0 |
| 0175 | FABRIC-GEOTEXTILE CLASS 1 | 02602 | 39,352.000 |
39,352.000 |
$1.440 |
SQYD | 0.5 |
| 0180 | FABRIC-GEOTEXTILE CLASS 2 FOR PIPE | 02607 | 8,239.000 |
8,239.000 |
$2.000 |
SQYD | 0.1 |
| 0185 | MAINTAIN & CONTROL TRAFFIC (SYP 4-153.01) | 02650 | 1.000 |
1.000 |
$225,088.160 |
LS | 2.0 |
| 0190 | DIVERSIONS (BY-PASS DETOURS) DIVERSONS KY 251 #1 (REVISED 11-18-25) | 02651 | 1.000 |
1.000 |
$56,514.440 |
LS | 0.5 |
| 0195 | PORTABLE CHANGEABLE MESSAGE SIGN | 02671 | 6.000 |
6.000 |
$1,992.560 |
EACH | 0.1 |
| 0200 | MOBILIZATION FOR MILL & TEXT | 02676 | 1.000 |
1.000 |
$3,874.430 |
LS | 0.0 |
| 0205 | ASPHALT PAVE MILLING & TEXTURING | 02677 | 322.000 |
322.000 |
$40.520 |
TON | 0.1 |
| 0210 | SAFELOADING | 02690 | 90.100 |
90.100 |
$256.880 |
CUYD | 0.2 |
| 0215 | EDGELINE RUMBLE STRIPS | 02697 | 32,481.000 |
32,481.000 |
$0.200 |
LF | 0.1 |
| 0220 | TEMP SILT FENCE | 02701 | 8,575.000 |
8,575.000 |
$1.850 |
LF | 0.1 |
| 0225 | SILT TRAP TYPE A | 02703 | 46.000 |
46.000 |
$377.340 |
EACH | 0.2 |
| 0230 | SILT TRAP TYPE B | 02704 | 46.000 |
46.000 |
$274.710 |
EACH | 0.1 |
| 0235 | SILT TRAP TYPE C | 02705 | 46.000 |
46.000 |
$303.020 |
EACH | 0.1 |
| 0240 | CLEAN SILT TRAP TYPE A | 02706 | 46.000 |
46.000 |
$68.670 |
EACH | 0.0 |
| 0245 | CLEAN SILT TRAP TYPE B | 02707 | 46.000 |
46.000 |
$62.410 |
EACH | 0.0 |
| 0250 | CLEAN SILT TRAP TYPE C | 02708 | 46.000 |
46.000 |
$47.120 |
EACH | 0.0 |
| 0255 | STAKING | 02726 | 1.000 |
1.000 |
$54,693.540 |
LS | 0.5 |
| 0260 | EROSION CONTROL BLANKET | 05950 | 9,897.000 |
9,897.000 |
$1.700 |
SQYD | 0.2 |
| 0265 | TEMP MULCH | 05952 | 146,497.000 |
146,497.000 |
$0.240 |
SQYD | 0.3 |
| 0270 | TEMP SEEDING AND PROTECTION | 05953 | 109,873.000 |
109,873.000 |
$0.300 |
SQYD | 0.3 |
| 0275 | INITIAL FERTILIZER | 05963 | 1.400 |
1.400 |
$930.450 |
TON | 0.0 |
| 0280 | MAINTENANCE FERTILIZER | 05964 | 7.200 |
7.200 |
$930.450 |
TON | 0.1 |
| 0285 | SEEDING AND PROTECTION | 05985 | 50,975.000 |
50,975.000 |
$0.450 |
SQYD | 0.2 |
| 0290 | SODDING | 05990 | 78,064.000 |
78,064.000 |
$7.540 |
SQYD | 5.3 |
| 0295 | AGRICULTURAL LIMESTONE | 05992 | 32.000 |
32.000 |
$98.090 |
TON | 0.0 |
| 0300 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 73,100.000 |
73,100.000 |
$0.310 |
LF | 0.2 |
| 0305 | PAVE STRIPING-PERM PAINT-6 IN | 06515 | 60,323.000 |
60,323.000 |
$0.330 |
LF | 0.2 |
| 0310 | PAVE MARKING-THERMO STOP BAR-24IN | 06568 | 26.000 |
26.000 |
$15.100 |
LF | 0.0 |
| 0315 | PAVE MARKING-THERMO CURV ARROW | 06574 | 3.000 |
3.000 |
$151.050 |
EACH | 0.0 |
| 0320 | PAVE MARKING-THERMO ONLY | 06576 | 2.000 |
2.000 |
$503.490 |
EACH | 0.0 |
| 0325 | FUEL ADJUSTMENT | 10020NS | 101,350.000 |
101,350.000 |
$1.000 |
DOLL | 0.9 |
| 0330 | ASPHALT ADJUSTMENT | 10030NS | 125,545.000 |
125,545.000 |
$1.000 |
DOLL | 1.1 |
| 0335 | OBJECT MARKER TY 3 | 20191ED | 6.000 |
6.000 |
$38.140 |
EACH | 0.0 |
| 0340 | CENTERLINE RUMBLE STRIPS | 20458ES403 | 16,850.000 |
16,850.000 |
$0.300 |
LF | 0.0 |
| 0345 | LONGITUDINAL EDGE KEY | 21289ED | 15,087.000 |
15,087.000 |
$5.460 |
LF | 0.7 |
| 0350 | G/R STEEL W BEAM-S FACE (7 FT POST) | 21802EN | 3,112.500 |
3,112.500 |
$31.120 |
LF | 0.9 |
| 0355 | PAVE MARKING-THERMO YIELD BAR-36 IN | 22520EN | 12.000 |
12.000 |
$25.170 |
LF | 0.0 |
| 0360 | TURF REINFORCEMENT MAT 1 | 23274EN11F | 11,711.000 |
11,711.000 |
$5.700 |
SQYD | 0.6 |
| 0365 | FENCE-SPECIAL | 24466EN | 50.000 |
50.000 |
$9.670 |
LF | 0.0 |
| 0370 | R/W MONUMENT TYPE 3 | 24540 | 5.000 |
5.000 |
$192.600 |
EACH | 0.0 |
| 0375 | ELECTRONIC DELIVERY MGMT SYSTEM - AGG | 26248EC | 1.000 |
1.000 |
$1,006.980 |
LS | 0.0 |
| 0500 | DIVERSIONS (BY-PASS DETOURS) CULVERT 246+43.70 (ADDED 11-18-2025) | 02651 | 1.000 |
1.000 |
$21,062.390 |
LS | 0.2 |
Category Total $4,285,725.70 |
| SM- Project | DE04702512533 | CATEGORY NUMBER | 0003 | CATEGORY Description | DRAINAGE |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0380 | ENTRANCE PIPE-15 IN | 00440 | 3,038.000 |
3,038.000 |
$47.880 |
LF | 1.3 |
| 0385 | ENTRANCE PIPE-18 IN | 00441 | 424.000 |
424.000 |
$70.690 |
LF | 0.3 |
| 0390 | CULVERT PIPE-18 IN | 00462 | 1,983.000 |
1,983.000 |
$170.440 |
LF | 3.1 |
| 0395 | CULVERT PIPE-24 IN | 00464 | 325.000 |
325.000 |
$176.210 |
LF | 0.5 |
| 0400 | STORM SEWER PIPE-18 IN | 00522 | 4.000 |
4.000 |
$133.680 |
LF | 0.0 |
| 0405 | PIPE CULVERT HEADWALL-18 IN | 01204 | 20.000 |
20.000 |
$1,631.290 |
EACH | 0.3 |
| 0410 | PIPE CULVERT HEADWALL-24 IN | 01208 | 1.000 |
1.000 |
$1,749.800 |
EACH | 0.0 |
| 0415 | SLOPED BOX OUTLET TYPE 1-18 IN | 01433 | 2.000 |
2.000 |
$2,044.330 |
EACH | 0.0 |
| 0420 | S & F BOX INLET-OUTLET-18 IN | 01450 | 15.000 |
15.000 |
$2,730.770 |
EACH | 0.4 |
| 0425 | S & F BOX INLET-OUTLET-24 IN | 01451 | 9.000 |
9.000 |
$3,920.590 |
EACH | 0.3 |
| 0430 | DROP BOX INLET TYPE 3 (REVISED 11-18-25) | 01496 | 6.000 |
6.000 |
$4,941.530 |
EACH | 0.3 |
| 0435 | DROP BOX INLET TYPE 3 MOD | 01497 | 2.000 |
2.000 |
$4,235.090 |
EACH | 0.1 |
| 0440 | JUNCTION BOX | 01650 | 1.000 |
1.000 |
$2,073.660 |
EACH | 0.0 |
| 0445 | CLEAN PIPE STRUCTURE | 03262 | 23.000 |
23.000 |
$906.280 |
EACH | 0.2 |
| 0450 | PIPELINE INSPECTION | 24814EC | 2,312.000 |
2,312.000 |
$2.370 |
LF | 0.0 |
Category Total $752,445.51 |
| SM- Project | DE04702512533 | CATEGORY NUMBER | 0004 | CATEGORY Description | BRIDGE- 5'X5' RCBC DRAWING #28431 |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0455 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 33.200 |
33.200 |
$198.980 |
CUYD | 0.1 |
| 0460 | FOUNDATION PREPARATION | 08003 | 1.000 |
1.000 |
$19,066.290 |
LS | 0.2 |
| 0465 | CONCRETE-CLASS A | 08100 | 84.600 |
84.600 |
$885.250 |
CUYD | 0.7 |
| 0470 | STEEL REINFORCEMENT | 08150 | 9,503.000 |
9,503.000 |
$2.050 |
LB | 0.2 |
| 0475 | SAW-CLEAN-RESEAL RANDOM CRACKS | 21173EC | 30.000 |
30.000 |
$79.630 |
LF | 0.0 |
| 0480 | LIGHTWEIGHT CELLULAR CONCRETE FILL | 23930EC | 360.000 |
360.000 |
$234.770 |
CUYD | 0.8 |
| 0485 | CONCRETE PATCHING | 40101 | 2.500 |
2.500 |
$477.760 |
SQFT | 0.0 |
Category Total $208,146.22 |
| SM- Project | DE04702512533 | CATEGORY NUMBER | 0005 | CATEGORY Description | DEMOBILIZATION &/OR MOBILIZATION |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0490 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$173,000.000 |
LS | 1.6 |
| 0495 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$85,000.000 |
LS | 0.8 |
Category Total $258,000.00 |
| SM- Project | DE04702512534 |
| Fed/State Number | FD06 047 0251 002-007 |
| Project Description | KY 3005/ KY 251 ROUNDABOUT |
| *********** |
| SM- Project | DE04702512534 | CATEGORY NUMBER | 0001 | CATEGORY Description | PAVING |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0500 | CRUSHED STONE BASE | 00003 | 153.000 |
153.000 |
$31.860 |
TON | 0.0 |
| 0505 | ASPHALT SEAL AGGREGATE | 00100 | 338.000 |
338.000 |
$105.730 |
TON | 0.3 |
| 0510 | ASPHALT SEAL COAT | 00103 | 41.000 |
41.000 |
$906.280 |
TON | 0.3 |
| 0515 | LEVELING & WEDGING PG76-22 | 00194 | 28.000 |
28.000 |
$117.360 |
TON | 0.0 |
| 0520 | CL3 ASPH BASE 1.00D PG64-22 | 00214 | 159.000 |
159.000 |
$96.770 |
TON | 0.1 |
| 0525 | ASPHALT MATERIAL FOR TACK | 00356 | 7.000 |
7.000 |
$518.800 |
TON | 0.0 |
| 0530 | CL3 ASPH SURF 0.38B PG76-22 | 00387 | 1,393.000 |
1,393.000 |
$107.290 |
TON | 1.4 |
| 0535 | ASPHALT PAVE MILLING & TEXTURING | 02677 | 1,655.000 |
1,655.000 |
$31.420 |
TON | 0.5 |
| 0540 | ASPHALT MATERIAL FOR TACK NON-TRACKING | 24970EC | 7.000 |
7.000 |
$651.370 |
TON | 0.0 |
Category Total $306,087.57 |
| SM- Project | DE04702512534 | CATEGORY NUMBER | 0002 | CATEGORY Description | ROADWAY |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0545 | STANDARD CURB AND GUTTER | 01810 | 561.000 |
561.000 |
$49.450 |
LF | 0.3 |
| 0550 | ISLAND CURB AND GUTTER MODIFIED | 01825 | 395.000 |
395.000 |
$41.000 |
LF | 0.1 |
| 0555 | STANDARD HEADER CURB | 01875 | 1,206.000 |
1,206.000 |
$32.170 |
LF | 0.4 |
| 0560 | ISLAND HEADER CURB TYPE 1 | 01890 | 986.000 |
986.000 |
$24.340 |
LF | 0.2 |
| 0565 | MOUNTABLE MEDIAN TYPE 3A | 01947 | 143.000 |
143.000 |
$227.460 |
SQYD | 0.3 |
| 0570 | BARRICADE-TYPE III | 02014 | 8.000 |
8.000 |
$151.050 |
EACH | 0.0 |
| 0575 | REMOVE CONCRETE ISLAND | 02016 | 57.000 |
57.000 |
$7.360 |
SQYD | 0.0 |
| 0580 | JPC PAVEMENT-10 IN | 02069 | 320.000 |
320.000 |
$165.110 |
SQYD | 0.5 |
| 0585 | CEM CONC ENT PAVEMENT-8 IN | 02101 | 978.000 |
978.000 |
$118.490 |
SQYD | 1.0 |
| 0590 | TEMP DITCH | 02159 | 1,033.000 |
1,033.000 |
$1.070 |
LF | 0.0 |
| 0595 | CLEAN TEMP DITCH | 02160 | 516.000 |
516.000 |
$0.880 |
LF | 0.0 |
| 0600 | ROADWAY EXCAVATION | 02200 | 367.000 |
367.000 |
$8.580 |
CUYD | 0.0 |
| 0605 | CLEARING AND GRUBBING 0.14 AC | 02545 | 1.000 |
1.000 |
$1,510.470 |
LS | 0.0 |
| 0610 | TEMPORARY SIGNS | 02562 | 800.000 |
800.000 |
$6.040 |
SQFT | 0.0 |
| 0615 | EDGE KEY | 02585 | 250.000 |
250.000 |
$5.700 |
LF | 0.0 |
| 0620 | MAINTAIN & CONTROL TRAFFIC (SYP 4-153.06) | 02650 | 1.000 |
1.000 |
$26,525.010 |
LS | 0.2 |
| 0625 | PORTABLE CHANGEABLE MESSAGE SIGN | 02671 | 4.000 |
4.000 |
$1,992.560 |
EACH | 0.1 |
| 0630 | MOBILIZATION FOR MILL & TEXT | 02676 | 1.000 |
1.000 |
$3,874.430 |
LS | 0.0 |
| 0635 | TEMP SILT FENCE | 02701 | 3,791.000 |
3,791.000 |
$1.850 |
LF | 0.1 |
| 0640 | SILT TRAP TYPE A | 02703 | 1.000 |
1.000 |
$377.340 |
EACH | 0.0 |
| 0645 | SILT TRAP TYPE B | 02704 | 1.000 |
1.000 |
$274.710 |
EACH | 0.0 |
| 0650 | SILT TRAP TYPE C | 02705 | 8.000 |
8.000 |
$303.020 |
EACH | 0.0 |
| 0655 | CLEAN SILT TRAP TYPE A | 02706 | 1.000 |
1.000 |
$68.670 |
EACH | 0.0 |
| 0660 | CLEAN SILT TRAP TYPE B | 02707 | 1.000 |
1.000 |
$62.410 |
EACH | 0.0 |
| 0665 | CLEAN SILT TRAP TYPE C | 02708 | 16.000 |
16.000 |
$47.120 |
EACH | 0.0 |
| 0670 | SIDEWALK-4 IN CONCRETE | 02720 | 498.000 |
498.000 |
$82.010 |
SQYD | 0.4 |
| 0675 | STAKING | 02726 | 1.000 |
1.000 |
$19,449.200 |
LS | 0.2 |
| 0680 | ARROW PANEL | 02775 | 3.000 |
3.000 |
$805.590 |
EACH | 0.0 |
| 0685 | EROSION CONTROL BLANKET | 05950 | 471.000 |
471.000 |
$1.700 |
SQYD | 0.0 |
| 0690 | TEMP MULCH | 05952 | 452.000 |
452.000 |
$0.240 |
SQYD | 0.0 |
| 0695 | TEMP SEEDING AND PROTECTION | 05953 | 339.000 |
339.000 |
$0.300 |
SQYD | 0.0 |
| 0700 | INITIAL FERTILIZER | 05963 | 1.000 |
1.000 |
$930.450 |
TON | 0.0 |
| 0705 | MAINTENANCE FERTILIZER | 05964 | 1.000 |
1.000 |
$930.450 |
TON | 0.0 |
| 0710 | SEEDING AND PROTECTION | 05985 | 581.000 |
581.000 |
$0.450 |
SQYD | 0.0 |
| 0715 | SODDING | 05990 | 76.000 |
76.000 |
$7.540 |
SQYD | 0.0 |
| 0720 | AGRICULTURAL LIMESTONE | 05992 | 0.500 |
0.500 |
$98.090 |
TON | 0.0 |
| 0725 | TOPSOIL FURNISHED AND PLACED | 05997 | 163.000 |
163.000 |
$31.410 |
CUYD | 0.0 |
| 0730 | PAVE STRIPING-TEMP PAINT-6 IN | 06511 | 8,300.000 |
8,300.000 |
$0.320 |
LF | 0.0 |
| 0735 | PAVE STRIPING-THERMO-6 IN W | 06542 | 8,766.000 |
8,766.000 |
$1.360 |
LF | 0.1 |
| 0740 | PAVE STRIPING-THERMO-6 IN Y | 06543 | 4,593.000 |
4,593.000 |
$1.360 |
LF | 0.1 |
| 0745 | PAVE STRIPING-THERMO-8 IN W | 06544 | 211.000 |
211.000 |
$3.020 |
LF | 0.0 |
| 0750 | PAVE STRIPING-THERMO-12 IN W | 06546 | 132.000 |
132.000 |
$8.060 |
LF | 0.0 |
| 0755 | PAVE MARKING-THERMO CROSS-HATCH | 06569 | 9,959.000 |
9,959.000 |
$6.290 |
SQFT | 0.6 |
| 0760 | PAVE MARKING-THERMO STR ARROW | 06573 | 4.000 |
4.000 |
$151.050 |
EACH | 0.0 |
| 0765 | PAVE MARKING-THERMO CURV ARROW | 06574 | 22.000 |
22.000 |
$151.050 |
EACH | 0.0 |
| 0770 | PAVE MARKING-THERMO COMB ARROW | 06575 | 2.000 |
2.000 |
$302.100 |
EACH | 0.0 |
| 0775 | INLAID PAVEMENT MARKER-MW | 06610 | 115.000 |
115.000 |
$23.160 |
EACH | 0.0 |
| 0780 | INLAID PAVEMENT MARKER-BY | 06612 | 78.000 |
78.000 |
$23.160 |
EACH | 0.0 |
| 0785 | LONGITUDINAL EDGE KEY | 21289ED | 349.000 |
349.000 |
$5.460 |
LF | 0.0 |
| 0790 | PAVE MARKING-THERMO YIELD BAR-36 IN | 22520EN | 86.000 |
86.000 |
$25.170 |
LF | 0.0 |
| 0795 | WATER BLASTING EXISTING STRIPE | 22664EN | 2,293.000 |
2,293.000 |
$3.020 |
LF | 0.1 |
| 0800 | DETECTABLE WARNINGS | 23158ES505 | 160.000 |
160.000 |
$47.020 |
SQFT | 0.1 |
| 0805 | PAVE MARK-THERMO-X-WALK-24 IN | 23261EC | 450.000 |
450.000 |
$15.100 |
LF | 0.1 |
| 0810 | LANDSCAPING | 23721NN | 1.000 |
1.000 |
$55,711.240 |
LS | 0.5 |
| 0815 | PAVE MARK-THERMO-YIELD | 24114EC | 8.000 |
8.000 |
$453.140 |
EACH | 0.0 |
| 0820 | ROUNDABOUT ARROW | 24115EC | 28.000 |
28.000 |
$503.490 |
EACH | 0.1 |
| 0825 | PAVE MARKING-THERMO DOTTED LANE EXTEN | 24683ED | 62.000 |
62.000 |
$10.070 |
LF | 0.0 |
| 0830 | REMOVE SIGNAL EQUIPMENT | 24955ED | 1.000 |
1.000 |
$5,326.760 |
EACH | 0.0 |
Category Total $641,875.15 |
| SM- Project | DE04702512534 | CATEGORY NUMBER | 0003 | CATEGORY Description | DRAINAGE |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0840 | STORM SEWER PIPE-15 IN | 00521 | 242.000 |
242.000 |
$149.190 |
LF | 0.3 |
| 0845 | STORM SEWER PIPE-18 IN | 00522 | 49.000 |
49.000 |
$133.680 |
LF | 0.1 |
| 0850 | REMOVE PIPE | 01310 | 16.000 |
16.000 |
$45.960 |
LF | 0.0 |
| 0855 | CURB BOX INLET TYPE A | 01456 | 8.000 |
8.000 |
$5,634.840 |
EACH | 0.4 |
| 0860 | DROP BOX INLET TYPE 12A | 01550 | 2.000 |
2.000 |
$3,670.660 |
LF | 0.1 |
| 0865 | CAP DROP BOX INLET | 01584 | 2.000 |
2.000 |
$1,048.110 |
EACH | 0.0 |
| 0870 | FABRIC-GEOTEXTILE CLASS 2 FOR PIPE | 02607 | 408.000 |
408.000 |
$2.000 |
SQYD | 0.0 |
Category Total $98,721.92 |
| SM- Project | DE04702512534 | CATEGORY NUMBER | 0004 | CATEGORY Description | SIGNING |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0875 | SBM ALUM SHEET SIGNS .080 IN | 06406 | 591.000 |
591.000 |
$47.320 |
SQFT | 0.3 |
| 0880 | SBM ALUM SHEET SIGNS .125 IN | 06407 | 42.000 |
42.000 |
$48.980 |
SQFT | 0.0 |
| 0885 | STEEL POST TYPE 1 | 06410 | 733.000 |
733.000 |
$31.060 |
LF | 0.2 |
| 0890 | GMSS TYPE D | 21596ND | 18.000 |
18.000 |
$443.900 |
EACH | 0.1 |
| 0895 | BARCODE SIGN INVENTORY | 24631EC | 122.000 |
122.000 |
$47.950 |
EACH | 0.1 |
Category Total $66,630.36 |
| SM- Project | DE04702512534 | CATEGORY NUMBER | 0005 | CATEGORY Description | LIGHTING |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0900 | TRENCHING AND BACKFILLING | 04820 | 2,550.000 |
2,550.000 |
$12.650 |
LF | 0.3 |
| 0905 | ELECTRICAL JUNCTION BOX TYPE A | 20391NS835 | 8.000 |
8.000 |
$1,722.990 |
EACH | 0.1 |
| 0910 | BORE AND JACK CONDUIT | 21543EN | 750.000 |
750.000 |
$22.670 |
LF | 0.2 |
| 0915 | PVC CONDUIT-2 IN-SCHEDULE 80 | 24901EC | 2,800.000 |
2,800.000 |
$14.060 |
LF | 0.4 |
Category Total $102,411.92 |
| SM- Project | DE04702512534 | CATEGORY NUMBER | 0006 | CATEGORY Description | DEMOBILIZATION |
| PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
| 0920 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$85,000.000 |
LS | 0.8 |
Category Total $85,000.00 |